In this project, we were tasked with reinforcing the internal steel structure of a building. The load on the roof was too heavy to be supported by the original structure. Our technical drawings were approved by an engineer and we welding laser-cut plates to add them to the H beams of the old structure. This allowed us to strengthen the resistance of the structure.
Year of realization
2017
Project type
Steel beam reinforcement
Completion time
3 months