Our team was tasked with building a steel structure to house water tanks. A specific perimeter enabling their employees to walk around the tanks to inspect and maintain the structures.
Year
2017
Type of project
Duration
3 months
Our team was tasked with building a steel structure to house water tanks. A specific perimeter enabling their employees to walk around the tanks to inspect and maintain the structures.
Year
2017
Type of project
Duration
3 months